No. | Project | Client | Scope of Work | Number of Pipe Installation |
Total Length (Meter) |
Completion Date |
---|---|---|---|---|---|---|
1 |
Kerja-Kerja HDD Bulk 11KV Untuk Unit Pembangunan Aset Zon Johor |
Komasi Engineering Sdn Bhd |
Horizontal Directional Drilling |
1Way 160MM & 2Way 200MM |
23223 |
Apr-21 |
2 |
Supply & Installation of HDD works & Civil Works for Celcom Network Sdn Bhd |
Sutera Utama Sdn Bhd |
Horizontal Directional Drilling |
1Way 110MM |
6640 |
Oct-21 |
3 |
Civil/Cable Works Site: KNTN PETO FIU A (Kuantan-Pekan) For Maxis Broadland Sdn Bhd |
Sutera Utama Sdn Bhd |
Outside Plant & FTTH (EPCC) |
Cabel Installation |
1500 |
Dec-21 |
4 |
Civil/Cable Work Site: KNTN PETO FIU B (Kuantan-Pekan) For Maxis Broadland Sdn Bhd |
Sutera Utama Sdn Bhd |
Outside Plant & FTTH (EPCC) |
Cabel Installation |
1500 |
Dec-21 |
5 |
Civil/Cable Work Site: KNTN PETO FIU C (Kuantan-Pekan) For Maxis Broadland Sdn Bhd |
Sutera Utama Sdn Bhd |
Outside Plant & FTTH (EPCC) |
Cabel Installation |
1500 |
Dec-21 |
6 |
Fiberization PMU TTJF to PMU TJID for TNB IT |
Sutera Utama Sdn Bhd |
Horizontal Directional Drilling |
1Way 110MM |
3511 |
Aug-22 |
7 |
Kerja-Kerja HDD 11KV IM10 Johor Unpetal Untuk Unit Asset Planning & Performance Zon Johor for Tenaga Nasional Berhad |
Komasi Engineering Sdn Bhd |
Horizontal Directional Drilling |
1Way 160MM, 1Way 200MM & 2Way 160MM" |
26480 |
Aug-22 |
8 |
Kerja-Kerja HDD 11KV IM10 Johor Unpetal Untuk Unit Asset Planning & Performance Zon Johor |
Sutera Utama Sdn Bhd |
Horizontal Directional Drilling |
"1Way 160MM, 1Way 200MM & 2Way 160MM" |
23960 |
Oct-22 |
9 |
Cadangan Pembangunan Perumahan Tanah Yayasan Negeri Sembilan di Atas PT40122, (HSD 246817), Mukim Labu, Daerah Seremban, Negeri Sembilan Darul Khusus |
Primuncak Construction Sdn Bhd |
Horizontal Directional Drilling |
1Way 200MM |
5531 |
Dec-22 |
10 |
Kerja-Kerja Horinzontal Direct Drilling (HDD) 11kV for Asset Development All Zones, Distribution Network, TNB-Zone Selatan (Subzone Johor Bahru/Johor Jaya) Location: Seri Austin |
Selatan Takzim Sdn Bhd |
Horizontal Directional Drilling |
1Way 160MM |
4172 |
Jan-23 |
11 |
Kerja-Kerja Perentangan dan Penyambungan Kabel 33kV untuk Unit Pembangunan Aset Negeri Sembilan, Bahagian Pembahagian TNB-Scenario1. For Tenaga Nasional Berhad |
Komasi Engineering Sdn Bhd |
Power Distribution Network (EPCC) |
Cabel Installation |
15117 |
Mar-23 |
12 |
HDD Works for Sungai Mati 132/33kV to Mobile PPu Bukit Gambir 33/11kV |
Viva Complete Snd Bhd |
Horizontal Directional Drilling |
2Way 110MM & 6Way 160MM |
1550 |
Mar-23 |
13 |
Kerja-Kerja Horizontal Direct Drilling (Hdd) 11kv For Asset Development Distribution Network Division, Tnb – South Zone (Subzone Johor Bahru) |
Komasi Engineering Sdn Bhd |
Horizontal Directional Drilling |
2Way 160MM |
831 |
Apr-23 |
14 |
Supply & Installation and Commissioning of FTTX Network Infrastructure for Zone 2: Eastern & Southern Region |
Komasi Engineering Sdn Bhd |
Horizontal Directional Drilling Cable Work Via Microtrenching |
1Way 110MM Cabel Installation |
2789 13,327 |
June-23 |
15 |
Supply & Installation and Commissioning of FTTX Network Infrastructure for Zone 2: Eastern & Southern Region |
Sutera Utama Sdn Bhd |
Horizontal Directional Drilling Cable Work Via Microtrenching |
1Way 110MM Cable Installation |
5501 105 |
June-23 |
Cable Work vis Micro trenching |
Cabel Installation |
105 |
||||
16 |
Proposed HDD Work for TNB Supply from PPU Pasir Putih to SS Vance Bioenergy Sdn Bhd & Food Excellent Specialist Sdn Bhd |
Bio Brilliant Sdn Bhd |
Horizontal Directional Drilling |
1Way 200MM |
6327 |
June-23 |
17 |
MSVT Merentang 1 Litar 3C 500MMP 11kV DA |
Sutera Utama Sdn Bhd |
Horizontal Directional Drilling |
1Way 200MM |
4421 |
June-23 |
18 |
Relocation Work Bukit Chagar Station Northbound And Jalan Tun Razak (Horizontal Directional Drilling Works) |
Sutera Utama Sdn Bhd |
Horizontal Directional Drilling |
4Way 110MM |
3779 |
Jul-23 |
19 |
Kerja-Kerja Horizontal Directional Drilling (Hdd) Bulk 11kv Untuk Unit Pembangunan Aset Zon Negeri Sembilan |
Komasi Engineering Sdn Bhd |
Horizontal Directional Drilling |
1Way 160MM, 1Way 200MM, 2Way 160MM & 3Way 160MM |
23802 |
Aug-23 |
20 |
Supply, Delivery, Installation, Testing And Commissioning Of Horizontal Directional Drilling (Hdd) Works And Associated Works At Jalan Bayu Laut 19/Ks9 And Jalan Bayu Impian 30/Ks9, Kota Bayuemas, Mukim Klang, Daerah Klang,
Selangor For Messrs. I&P Kota Bayuemas Sdn (Setia Bayuemas-Horizontal Directional Drilling (Hdd) Works From Ppu Bayuemas To Pe Bayuemas 5
|
Technology Engineering Concept Sdn Bhd |
Horizontal Directional Drilling |
2Way 200MM |
2292 |
Aug-23 |
21 |
Kerja-Kerja Horizontal Direct Drilling (Hdd) 11kv For Asset Development, Distribution Network Division, Tnb – Zone Selatan (Subzone Kluang / Mersing / Kota Tinggi) |
Komasi Engineering Sdn Bhd |
Horizontal Directional Drilling |
1Way 160MM |
5005 |
Sep-23 |
22 |
Kerja Kontrak Hdd (Bulk) Pgd3080 Msvt Merentang 1 Litar Kabel 3c500mmp Antara Ppu Bukit Pelali Ke Ssu Sebana Sepanjang 1206 Meter Untuk Reconfigure Sistem |
Selatan Takzim Sdn Bhd |
Horizontal Directional Drilling |
1Way 200MM |
8303 |
Sep-23 |
23 |
Hdd 11kv Selatan Bulk 2019 |
Sutera Utama Sdn Bhd |
Horizontal Directional Drilling |
1Way 160MM, 1Way 200MM, 2Way 160MM & 2Way 200MM |
102749 |
Nov-23 |
24 |
Kerja-Kerja Kecemasan Hdd N-1 Merentang 2 Litar Dari Cb01 Dan Cb02 Ppu Tampoi 3 Ke Tempat Potong Sambung Kabel Antara Pmu Kangkar Tebrau Ke Pandan Resident No.1 (2.3km) (D-Imj-S18-1729) |
Komasi Engineering Sdn Bhd |
Horizontal Directional Drilling |
1Way 160MM |
3336 |
Nov-23 |
25 |
Supply, Deliver, Install, Testing & Commissioning Of New Infrastructure And Fibre Optic Cable 96 Core From Fsb Sedenak To Kidex For Fiberail Sdn Bhd (Project Ref No. (1002)Fsb/Pa/Loa 2207-Po-0015 |
Komasi Engineering Sdn Bhd |
Horizontal Directional Drilling |
3Way 40MM |
3880 |
Dec-23 |
26 |
Kerja Kontrak Hdd Di Kawasan Pasir Gudang Untuk Tetuan Sj Holdings Sdn. Bhd For Supply And Install Hdd Works (Ref No : Stsb/Sjhsb-Pg/Kfesb/2023/001) |
Selatan Takzim Sdn Bhd |
Horizontal Directional Drilling |
2Way 200MM |
6570 |
Dec-23 |
27 |
Kerja-Kerja HDD Untuk Kontraktor Perkhidmatan Bumiputra TNB (KPB) For Tenaga Nasional Berhad |
Komasi Communications Sdn Bhd |
Horizontal Directional Drilling |
1Way 160MM |
2495 |
Feb-24 |